(1) The Accounting Policies Register defines Accounting Policies governing the definition, recognition, initial and subsequent measurement/valuation, depreciation/amortisation and de-recognition of non-current assets for the University and its Controlled Entities (the Group). (2) This Procedure establishes procedural requirements for the recording and accounting of non-current assets across the Group to deliver compliant financial reporting in accordance with requirements of the Accounting Policies Register. (3) The Procedure applies to all employees, consultants and contractors of the Group with responsibilities or accountabilities for the financial processing and reporting of non-current assets for all entities in the Group. (4) The following non-current assets are in scope of this Procedure: (5) Also in scope are the following asset-related liabilities: (6) The following non-current assets are not within the scope of this Procedure: (7) Refer to the Accounting Policies Policy and Accounting Policies Register for accounting policies governing non-current assets, including: (8) The Director, Financial Operations, Tax and Treasury has overall accountability for ensuring adherence to this Procedure across the Group, and thereby ensuring non-current asset accounting and reporting in accordance with the Accounting Policies Register. The Director, Financial Operations, Tax and Treasury is supported by the Financial Operations Expenditure Manager, who has responsibility for ensuring the adherence to the Procedure, and for providing necessary training to all necessary individuals involved in the financial processing and reporting of non-current assets. The Financial Operations Manager, Controlled Entities, will support the Financial Operations Expenditure Manager by ensuring adherence to this Procedure across controlled entities. (9) The Head of Accounting Advisory and Controls is available for consultation on complex non-current asset assessments where significant judgments are required. (10) This Procedure articulates a range of activities that collectively seek to mitigate the following identified key risks for non-current assets: (11) The Asset Register is an integrated asset module (sub-ledger) within the Finance One General Ledger system and is the repository for detailed information for all assets within the scope of this Procedure. (12) The Financial Operations Expenditure Manager will ensure that the Asset Register reconciles to the General Ledger each month, in accordance with the requirements of the General Ledger Governance Procedure. (13) System access to the Asset Register is governed by the Critical Finance Systems User Governance Procedure. (14) All changes to the asset data in the Asset Register, including meta-data attributes, require approval of the Financial Operations Expenditure Manager. (15) An exceptions report will be reviewed monthly by the Financial Operations Expenditure Manager to identify and review all changes made to the Asset Register, including creation of new assets and adjustments to the metadata of existing assets. All changes must be supported by documentation, which must be retained on file. Unexpected changes will be investigated and resolved in a timely manner. Completion of this activity, with a summary of findings and any actions arising, will be reported to the Director, Financial Operations, Tax and Treasury. (16) Under the current operational use of the University Finance One General Ledger, capital addition costs are initially charged to the Income Statement and are subsequently transferred each month to the Balance Sheet (either to CIP or directly to the Asset Register). (17) Correct usage of the Ledger (both Natural Accounts and Major Accounts) is critical to enable timely and accurate identification of capital expenditure in the Income Statement. The Financial Operations Expenditure Manager will ensure robust processes are in place to ensure correct usage of the Ledger for the coding of capital transactions each month. (18) The relevant sections of the Income Statement and Balance Sheet under the scope of this Procedure are as follows. Details of Natural Accounts mapped to each of these reporting codes are included in Appendix Three. (19) Major capital works are managed as projects, and assigned a bespoke Major Account in Finance One, in accordance with the Project and Operations Ledger Account Policy and Project and Operations Ledger Account Procedure. (20) Selection codes are assigned to Major Accounts for major capital works as follows: (21) The Financial Operations Expenditure Manager will ensure robust processes are in place to transfer identified capital expenditure from the Income Statement to the CIP account and will review a reconciliation of the transfers each month. (22) The Capex Project Report will support the transfer of capital expenditure from the Income Statement to the CIP account. The Capex Project Report comprises two parts: (23) Capital expenditure for the period will be transferred by debit entry to the CIP account at capital works project level in accordance with report 1a. The credit entry will be posted at natural account level in accordance with report 1b, and on the capex offset project account for IT or Property capital works rather than individual capital works projects. (24) The clearing accounts are as follows: (25) Non-current assets are classified into asset classes, as defined in the Accounting Policies Register. Asset classes are further classified into asset sub-classes. Examples of expenditure by asset sub-class are included in Appendix One to this procedure. (26) Correct assignment of capital assets to asset class/sub-class is essential, as it impacts both depreciation/amortization rates and presentation in the financial statements. The Financial Operations Expenditure Manager will ensure capital expenditure is grouped according to this sub-class guidance prior to transfers from CIP to the Asset Register. (27) On completion of the asset acquisition/construction, capitalized costs are transferred from CIP and grouped into new asset(s) within the Asset Register. Asset transfer forms or project completion certificates will include the following information: (28) To ensure quality of asset creation, the Financial Operations Expenditure Manager will critically review and approve all transfer forms prior to transfer of data from CIP to Asset Register, to ensure: (29) Additionally, documentation supporting the creation of new assets in the Asset Register will be quality assurance reviewed by the Financial Operations Director for material assets above the following thresholds: (30) The monthly reconciliation of the CIP account balance will include: (31) The Accounting Policies Register details which asset classes are subsequently measured at depreciated historic cost and which at fair value. (32) For those classes measured at fair value the Register details the required fair value methodology and frequency of revaluation. All fair value revaluations are conducted by expert external valuers. (33) Refer to Appendix Two for specific requirements of the valuation of Land, Building, Infrastructure and Service Concession Assets asset classes. (34) The Director, Financial Operations, Tax and Treasury will oversee the revaluation of all ‘fair value’ asset classes in accordance with the requirements of the Accounting Policy Register, including: (35) The Financial Operations Expenditure Manager will support the revaluation of each appropriate asset class by: (36) The Property Director, or their nominated delegate, will support the revaluation of Land, Building and Infrastructure asset class valuations by providing: (37) Asset custodians are responsible for informing the Financial Operations team, in a timely manner, in the event of the following changes to asset circumstances: (38) Standard depreciation and amortization rates are included in the Accounting Policies Register. Variations to these rates can be made on the recommendation of the relevant operational Executive Director, with financial approval required as follows and approval retained on file: (39) The Financial Operations Expenditure Manager will perform an annual review of the Asset Register to review depreciation rates in use for all assets against the standard rates in the Accounting Policies Register for that asset class. Exceptions will be identified and verified as bona fide variations by confirmation to written variation approvals. (40) The Asset Register has capability to system-calculate the relevant monthly depreciation / amortization charge for each asset, based on the documented parameters of each asset. Calculations commence from the in-service date entered into the system and are accurate to the day (i.e., if an asset in-service date is mid-month, a partial month of depreciation is calculated for that asset’s first reporting period). (41) The system calculation is initiated and posted in accordance with the month-end timetable, published by the Director Financial Operations, after completion of the following activities and checks: (42) Accurate depreciation/amortization relies on timely capitalization of assets to the Asset Register. Occasionally, operational factors can cause a delay in the capitalization of assets. In such cases: (43) The Financial Operations Expenditure Manager will conduct an annual review of depreciation rates, as listed in the Accounting Policies Register, against comparable asset class rates used by a selection of other Australian Universities, to assess whether rates used by Macquarie University remain within tolerance of other entities in the sector. A report on findings will be submitted to the Director Financial Operations and Deputy Group Chief Financial Officer for discussion and decision. (44) Asset residual values and/or useful lives may be reassessed/changed: (45) All asset disposals must be approved in accordance with the Delegations of Authority Register. Evidence of authority for disposal will be retained on file. (46) Disposal forms used will include key information about the asset to enable processing of the disposal from the Asset Register, including asset name, number, current net book value, net proceeds from sale, and rationale for disposal. (47) Gains or losses on disposal will be calculated in accordance with the Accounting Policies Register and recorded in Natural Accounts mapping to MR_4.04.01.26 - Gain or loss on disposal of Assets. (48) The Financial Operations Expenditure team will process authorized disposals by removing the asset from the Asset Register. (49) Additionally, documentation supporting the disposal of assets in the Asset Register will be quality assurance reviewed by the Financial Operations Director for material assets above the following thresholds: (50) Asset disposals will be reported bi-annually to the Finance and Facilities Committee. (51) Asset verification activities form an important part of asset management protocols. Asset verification activities will address the following key areas: (52) An annual Asset Verification Plan will be created by the Director of Financial Operations, approved by the Group Deputy Chief Financial Officer and retained on file. (53) The Asset Verification Plan includes all asset-classes that are not subject to valuation by an external valuer in the financial year, except for Library General and Digital Library Collections (refer to the specific asset section below for asset verification approaches for these asset classes). (54) The Asset Verification Plan sets out the annual plan for the following asset verification activities: (55) Findings from the executed Asset Verification Plan (including adjustments required to the Asset Register and outcomes of the investigation of any discrepancies arising from the work conducted), will be reported by the Director, Financial Operations, Tax and Treasury to the Group Deputy Chief Financial Officer bi-annually. (56) The Financial Operations Expenditure Manager will ensure that any updates required to the Asset Register as a result of the findings of the annual Asset Verification Plan are processed into the Asset Register in a timely manner. (57) Should any indicators of impairment be identified as part of the Asset Verification Plan, or from other management information, the Financial Operations Expenditure Manager will conduct an impairment assessment in accordance with the requirements of the Accounting Policy Register. (58) Outcomes of all impairment reviews will be presented to the Director, Financial Operations, Tax and Treasury and Group Deputy Chief Financial Officer and Vice-President, Finance and Resources in a timely manner. (59) Pre-month end preparation: planned major activities impacting non-current assets in scope of this Procedure are discussed in the pre-month-end planning meeting each month, in accordance with the month-end timetable, with actions assigned to appropriate staff. (60) Capital expenditure: Analytical summaries of capital expenditure will be prepared and reviewed in detail each month in accordance with the published month-end timetable, detailing, by project: (61) Depreciation and amortisation: monthly and YTD Income Statement charges will be compared to prior month, prior year and budget to identify variations in expected trends. Material variations will be investigated promptly. (62) Asset Register exception report: as described in section 3.3 above. (63) Ageing of CIP balances will be prepared each month by the Financial Operations Expenditure Analyst, and reviewed by the Financial Operations Expenditure Manager, to highlight all assets that have commenced service but are yet to be transferred to the Asset Register. Assets more than three months past their asset-in-service date will be reported to the Director Financial Operations accompanied by a plan for resolution. (64) Land holdings will be reconciled to the Government Property Register annually, as part of the annual revaluation process. (65) Building construction projects are likely to include a mixture of capital and operating costs. (66) An initial assessment of the capital and expenditure components of a proposed building project must be completed by the Program or Project Manager and will be reviewed by the Finance Business Partner before the project is submitted for internal funding approval, with the assessment included in the business case. (67) Costs incurred over the life of a building project must be identified and recorded with sufficient granularity to delineate between the types of costs that are capitalizable and expensed, and the specific assets to be capitalised. (68) The asset in use date for a new building will be the date the occupancy certificate is granted, unless advised otherwise in writing by the Property Director. (69) The feasible Remaining Useful Economic Life of each building is assessed and suggested to management annually by the external valuer. (70) The Financial Operations Expenditure Manager will liaise annually with the Property Director to assess whether the feasible Remaining Useful Economic Life needs to be reduced to reflect the intended use of the building. (71) Identified variations in remaining Useful Economic Life that would trigger a change in annual depreciation require approval as follows: (72) DLP costs, and their eligibility for capitalization, are defined and discussed in the Accounting Policies Register. DLP costs will be capitalized with the following frequency from Construction in Progress to the newly created underlying building asset in the Assets Register: (73) The Accounting Policies Register contains policy guidance on when it is permitted to capitalize borrowing costs incurred to fund the construction of a physical asset (most commonly a building) is included in. Any such costs are capitalised as part of the new building asset. (74) Purchase orders for equipment eligible for capitalization must be coded to the Natural Account 5005 - Equipment - Capital within MR_7.01.01.01 - Capital Equipment. The Financial Operations Expenditure Analyst will review these accounts each month to identify equipment to be capitalized and liaise with the relevant Asset Custodians to obtain all necessary information required to make a new asset entry into the Asset Register. (75) Partial, deposit or progress payments towards an asset are held in CIP until the asset is in the condition and location for use, when it will be transferred to the Asset Register. (76) The Financial Operations Expenditure Analyst will conduct a quarterly review of transactions coded to the Natural Accounts that map to MR_4.04.01.07 - Non-capitalised equipment, to identify any capitalizable assets that have been coded to the wrong Natural account. Evidence of review and actions arising will be retained on file. (77) The depreciation rate for leasehold improvement assets must align with the lease term of the asset being leased. (78) Leasehold improvement assets and Make Good Provisions will be assessed quarterly for completeness and alignment with the lease term of the asset being leased, and on the: (79) As detailed in the Accounting Policies Register, Library expenditure is capitalized when the asset or license includes perpetual access rights to the purchased information. This includes both physical assets, such as books, as well as digital assets. (80) Decisions about the nature of the license agreement, and whether it includes the perpetual right clause, are made by the Library Operations team, which then raises Purchase Orders for the licenses to either capitalizable or operating expense Natural Accounts as follows: (81) The Financial Operations team will conduct a bi-annual quality control over this process undertaken by the Library Operations team, to ensure an ongoing understanding of, and adherence to the need for careful coding on library digital invoices based on clauses governing perpetual access. Results of this quality control review will be retained on file. (82) Capitalizable library assets (both physical books and intangible digital library items) are coded to Natural Account 5012 - Library Collection CAPEX which is mapped to MR_7.01.01.01 - Capital Equipment. Costs to this Natural Account are then required to be split into two asset classes for capitalization into the Asset Register: (83) In recent years the vast majority of expenditure in Natural Account 5012 has related to Digital Library Collections items (> 98% in 2021). For efficiency, all expenditure coded to this Natural Account 5012 will be deemed to be a Digital Library Collection asset, if this ratio of intangible: tangible expenditure does not fall below 95:5. The Financial Operations team will conduct an annual review of this ratio to ensure adherence to this clause and will retain evidence of this review on file. Should the review reveal that the ratio falls below 95:5 over an averaged 12-month period, the allocation of costs to the two asset classes will then adjust to reflect the ratio determined in the most recent annual review for the following 12 months, until the next review is performed. (84) PPE: Library General and Intangible Asset: Digital Library Collections assets are capitalized as a monthly sum of spend in the month; the Asset Register is not intended to detail each individual item purchased (this operational data is stored in the Library catalogues). Consequently, asset verification of these two asset classes is not practical. Assets in these classes are pragmatically deemed to have no further value to the University once they are fully depreciated and are removed from the Asset Register once they reach nil NBV in accordance with this Procedure. (85) Library Specific assets comprise specific rare book, map and other artefact collections. In accordance with the Accounting Policies Register, they are not depreciated and are fair valued by an external valuer triennially. (86) Works of Art assets are typically acquired by way of non-cash gift donation. Donated capital additions are added to the Asset Register when the asset is deemed to be controlled by the University, with the other side of the entry recorded as ‘non-cash donation’ in the Income Statement. (87) Works of Art additions to the Asset Register will be reconciled bi-annually to the donation register maintained by the Philanthropy team. (88) The total Works of Art asset-class in the Asset Register will be reconciled bi-annually to the operational database of Works of Asset owned by the Librarian. (89) The asset in use date for new infrastructure will be: (90) Patents are typically derecognized for two reasons, either the: (91) All patents (both completed assets in the Asset Register and those in development, with costs in Construction in Progress) will be reviewed annually by the Financial Operations Team in conjunction with Office of the PVC Research and Innovation (patent custodians). Disposal will be approved in accordance with the Delegations Register. (92) IT projects are likely to include a mixture of capital and operating costs. Criteria for IT software costs that can be capitalised are included in the Accounting Policy register. (93) As initial assessment of the capital and expenditure components of a proposed IT project must be completed by the Program or Project Manager and will be reviewed by the Finance Business Partner before the project is submitted for internal funding approval, with the assessment included in the business case. (94) Costs incurred over the life of an IT project must be identified and recorded with sufficient granularity to delineate between the types of costs that are capitalizable and expensed, and the specific assets to be capitalised. (95) Labour costs form a material component of most IT projects. Time allocations in labour allocation tools must be classified in line with activities as defined in the Accounting Policies Register to enable delineation between both capital and operating activities, and to further split within capital expenditure according to the specific assets to be capitalised. Time allocations by activity and team member must be reviewed and approved by the IT Program or Project Manager each quarter, as a minimum, or more frequently if significant shifts in time allocation occur within the quarter. Evidence of review and approval will be retained on file. (96) Typical useful economic lives are detailed in the Accounting Policies Register. (97) Written approval of the expected useful life is required from the Chief Information and Digital Officer at the time of transfer from Construction in Progress to the Asset Register in the following circumstances: (98) Annual confirmation of remaining expected useful life of all intangible IT assets (software and cloud-based services) and tangible IT hardware is required from the Chief Information and Digital Officer for assets with a remaining net book value over $1m at the end of the financial year. (99) The Financial Operations Expenditure Manager will conduct a quarterly review (via inspection of the Contracts Database and enquiries with management) to identify all new contracts across the Group that may contain a lease. Evidence of review and actions arising will be retained on file. (100) Costs for short term and low value leases (‘exempt leases’ – as defined in the Accounting Policies Register) are expensed as operating costs over the term of the lease. (101) Non-exempt leases are accounted for via the creation of a Right of Use Asset and Liability, in accordance with the requirements of the Accounting Policies Register. The Financial Operations Expenditure Manager will manage the timely creation and subsequent accounting for Right of Use Assets and Liabilities identified during each quarterly review. Asset creation documentation must include all necessary data inputs for asset calculation and recognition, including: (102) The Financial Operations Expenditure Analyst will conduct a quarterly review of the Natural Accounts in MR_4.04.01.11 Rental, Hire and Other Leasing Fees to identify costs associated with any leases above the ‘exempt lease’ thresholds that have been incorrectly expensed to the Income Statement instead of creating a Right of Use Asset and Liability. Evidence of review and actions arising will be retained on file. Correcting journals will be processed to reverse any Income Statement expenses and create a Right of Use Asset and Liability. (103) The Financial Operations Expenditure Manager will manage the quarterly review of existing Right of Use Assets and Liabilities to identify whether the contractual terms of any of the leases have been modified and assess if these modifications trigger a remeasurement event, as defined in the Accounting Policies Register. Evidence of review and actions arising will be retained on file. (104) To aide this review, details of all property leases (both land and buildings and including long term leases of land under peppercorn lease) are maintained in the Progenesis database, which is owned by the Property division. The Property Director has responsibility for ensuring this database remains current, accurate and complete. The Financial Operations Expenditure Manager will obtain a verified extract of the Progenesis database from the Senior Asset Manager each quarter to facilitate this review of changes in lease parameters. (105) Additionally, the Financial Operations Expenditure Manager will also seek written quarterly guidance from the Property Director regarding: (106) The Financial Operations Expenditure Manager will ensure that any changes to lease contractual terms and any changes in management’s intentions for the duration of use of the leased assets are assessed for the financial impact of all lease-related assets and liabilities, including ROU Assets, Lease Liabilities, Leasehold Improvements as well as Make Good Provisions and potential Onerous Lease Provisions. (107) The Financial Operations Expenditure Manager will conduct a quarterly review to identify (via inspection of the Contracts Database and enquiries with management) all new contracts across the Group that may meet the criteria of a Service Concession Asset and ensure any such contracts are accounted for in accordance with the Accounting Policies Register. Evidence of review and actions arising will be retained on file. (108) The Financial Operations Expenditure Manager will manage the quarterly review of existing Service Concession Assets to identify whether the contractual terms of any of the assets have been modified and assess if these modifications trigger a remeasurement event, as defined in the Accounting Policies Register. Evidence of review and actions arising will be retained on file. (109) Lease assets are recognized when the Group provides a lease incentive (e.g., rent free period or assumption of fit out costs) to a lessee. (110) The Financial Operations Expenditure Manager will conduct a quarterly review to identify (via inspection of the Contracts Database and enquiries with management) all new or amendments to existing contracts across the Group where the entity is a lessor and identify if there are lease incentives included in the contract and ensure any such lease incentives are accounted for in accordance with the Accounting Policies Register. Evidence of review and actions arising will be retained on file. (111) Lease incentives recorded are reviewed in accordance with the Balance Sheet Reconciliation Procedure for completeness and accuracy and retention of supporting documentation to substantiate the lease incentives recognized, including verification of key lease terms to the Progenesis database attestations provide by Property, as noted in the ROU Asset section of this Procedure. (112) Finance lease assets are recognized when the Group transfers substantially all the risks and rewards of use over an asset to which is has legal title, to the lessee, at inception of the lease. (113) The Financial Operations Expenditure Manager will conduct a quarterly review to identify (via inspection of the Contracts Database and enquiries with management) all new contracts across the Group that may meet the criteria of a Finance Lease as Lessor and ensure any such contracts are accounted for in accordance with the Accounting Policies Register. Evidence of review and actions arising will be retained on file. (114) Assets that are subject to a finance lease to a lessee are reclassified from the original asset class (e.g., Land or Buildings) to a finance lease receivable. (115) The Financial Operations Expenditure Manager will manage the assessment of estimates and assumptions for finance leases, including the assessment of the interest rate implicit in the lease and the assessment of residual values of the asset under the lease. Key estimates will be endorsed by the Deputy Group Chief Financial Officer with evidence of review retained on file. (116) The Financial Operations Expenditure Manager will manage the quarterly review of existing Finance Leases where the University is the lessor, to identify whether the contractual terms of any of the assets have been modified and assess if these modifications trigger a remeasurement event, as defined in the Accounting Policies Register. This review will include verification of key lease terms to the Progenesis database attestations provide by Property, as noted in the ROU Asset section of this Procedure. This review should include the various long-term leases of land with nil lease payments. Evidence of review and actions arising will be retained on file. (117) Nil. (118) Refer to the following Finance Policies and Procedures for specific terms used in this document: (119) 5286 WIP CMP - SignageNon-Current Assets Procedure
Section 1 - Purpose
Scope
Top of PageSection 2 - Policy
Top of Page
Section 3 - Procedures
Part A - Accountabilities and Key Risks
Overall accountability for adherence to this Procedure
Key risks for non-current assets
Part B - Procedural requirements for all asset classes
Controls over access to, and changes to, the Asset Register
The Asset Register
Capital asset management - general requirements for use of the General Ledger
Capital additions initially recorded in the Income Statement
Natural Accounts to be used in the Income Statement and Balance Sheet (parent entity only)
Management Reporting (MR) code or
Financial Accounting (FA) code
Purpose of Natural Accounts in this MR code or Financial Accounting (FA) code
Balance Sheet:
Major Accounts to be used
Selection code
Purpose of Selection code
Transfer of capital expenditure from the Income Statement to CIP
Capex offset project account
Purpose of capex offset project account
New Asset additions – transfers from CIP to Asset Register
Use of asset classes and sub-asset classes in the Asset Register
Asset transfer forms / project completion certificates
New asset creation / asset modification, by asset class
Threshold for new/modified asset to require Director review
Reconciliation of spend remaining in CIP
Subsequent measurement including use of expert valuers
Other changes to asset information over time – the role of Asset Custodians
Depreciation and Amortization
Selection and data integrity of depreciation and amortization rates
NBV of Asset at date of recommended change in estimate
Approval needed
Depreciation and amortization charges - system calculation and manual accruals
Review of depreciation rates in use
Change of asset residual values or useful lives
Disposals
Class of asset disposed
Threshold for Director review of disposal – NBV of disposed asset
Asset Verification Plan
Indicators of impairment and impairment reviews
Month-end analysis and review
Part C - Procedural requirements specific to each asset class
Property, Plant and Equipment and Intangible Assets: Construction in Progress
Property, Plant and Equipment: Land
Property, Plant and Equipment: Buildings
Building construction projects – timely assessment and identification of capital and operating costs
Buildings – deemed asset in use date
Buildings – review of useful economic lives
Change in annual depreciation charge triggered by change on remaining UEL – by asset class
Approval required for change in remaining UEL
Buildings – Defect Liability Period (DLP) costs
DLP costs incurred against an individual building at end of month
Minimum frequency for transfer of expenditure from CIP to Asset Register
Buildings – Capitalization of Net Borrowing Costs
Property, Plant and Equipment: Plant & Equipment
Property, Plant and Equipment: Leasehold improvements
Evidence of review and actions arising will be retained on file.Property, Plant and Equipment: Library General and Intangible assets: Digital Library Collections
Identification of capitalizable assets
Library expenditure
Natural Account to be used
Allocation of capitalizable items between Library General and Digital Library Collections
Type of capitalizable expenditure coded to Natural Account 5012
Asset-class
Asset verification and write-off
Property, Plant and Equipment: Library Specific
Property, Plant and Equipment: Works of Art
Property, Plant and Equipment: Infrastructure
Intangible assets: Patents
Intangible assets: IT software (including cloud computing arrangements and website development costs)
IT projects – timely assessment and identification of capital and operating costs
IT projects – labour allocation
IT projects – initial useful economic lives
IT projects – annual review of useful economic lives
Right of Use (ROU) Assets and Liabilities: Building and Plant & Equipment
Initial identification
Subsequent review and adjustments
Service Concession Assets
Initial identification
Subsequent review and adjustments
Lease asset – lessor
Initial identification
Subsequent review and adjustments
Finance lease asset – Group as lessor
Recognition
Initial identification
Initial measurement and estimates
Subsequent review and adjustments
Appendices
Top of Page
Number
Appendix Title
Section 4 - Guidelines
Section 5 - Definitions
Appendix One: asset classes and sub-classes
Asset Register codes are shown in CAPITALS.
Asset Class name
Asset sub-class name
Example of expenditure
INTANGIBLE ASSET NOTE
RIGHT OF USE ASSET NOTE
SERVICE CONCESSION ASSETS NOTE
Appendix Two: Revaluation requirements for Land, Buildings and Infrastructure (both classified as PPE and SCA)
Activity
Physical Valuation
Desktop Valuation
Impacted Asset Class
Appendix Three: Natural Accounts used within the scope of this Procedure (parent only)
Management Reporting (MR) code or
Financial Accounting (FA) code
Natural Accounts in this MR code or Financial Accounting (FA) code
View Document
This is the current version of this document. You can provide feedback on this document to the document author - refer to the Status and Details on the document's navigation bar.
Income Statement:
MR_7.01.01.01 - Capital Equipment
MR_4.04.02.01 - CMP - WIP - Design phase
MR_4.04.02.02 - CMP - WIP - Construction phase
Used as the initial location of recording capital expenditure prior to transfer to the Balance Sheet.
CMP codes are also used for non-capital expenditure that is included in the Capital Management Plan budget. This non-capital expenditure is recognized as an expense and therefore not transferred to the Balance Sheet.
Capital expenditure on CMP codes is identified by reference to the Major Account, and the Major Account Funding Scheme code (refer clause 21) that is included with CMP natural account use.
MR_4.05.01.01 – Depreciation
MR_4.05.01.02 - Amortisation
Used to record depreciation and amortisation charges related to non-current assets in scope of this Procedure
MR_4.01.02.02.01 - Professional Salaries
Used as the initial location of recording employee expenses.
Capital expenditure on this MR code is identified by reference to the Major Account, and the Major Account Funding Scheme code (refer clause 21).
MR_4.04.01.07-Non-capitalised equipment
Used to record equipment items that do not meet the capitalization threshold defined in the Accounting Policies Register
MR_4.04.01.13 – Subscriptions
MR_4.04.01.22 - Library Collections
MR_4.04.01.23 - Computing, IT and Software
MR_4.04.02.03 - Facilities
Used to record operating costs that are often associated with capital projects
MR_4.04.01.26 - Gain or loss on disposal of Assets
Used to record the proceeds and asset write-off costs associated with asset disposals
FA_4.02.01 - Non-current Finance lease receivables
Used to record finance lease receivables where the University is the lessor
FA_4.05.01.01.01 - Non-current Lease asset
Used to record a right-of-use asset where the University is lessee
FA_4.07.01.01 - Cost: PPE Construction in progress
Used to record the initial costs to acquire or construct an item of Property, Plant and Equipment (PPE) before the item of PPE is commissioned
FA_4.07.02.02 - Valuation: PPE Land
Used to record the fair value of land
FA_4.07.03.02 - Valuation: PPE Buildings
Used to record the fair value of buildings
FA_4.07.03.03 - Accumulated depreciation: PPE Buildings
Used to record the accumulated depreciation charge recognized for buildings
FA_4.07.04.02 - Valuation: PPE Plant and equipment
Used to record the cost of plant and equipment including motor vehicles
FA_4.07.04.03 - Accumulated depreciation: PPE Plant and equipment
Used to record the accumulated depreciation charge recognized for plant and equipment
FA_4.07.05.01 - Cost: PPE Leasehold improvements
Used to record the cost of leasehold improvements
FA_4.07.05.03 - Accumulated depreciation: PPE Leasehold improvement
Used to record the accumulated depreciation charge recognized for leasehold improvements
FA_4.07.06.01 - Cost: PPE Library General
Used to record the cost of the general library collection
FA_4.07.06.03 - Accumulated depreciation: PPE Library General
Used to record the accumulated depreciation charge recognized for the general library collection
FA_4.07.07.02 - Valuation: PPE Library Special
Used to record the fair value of the special library collection
FA_4.07.08.02 - Valuation: PPE Works of Art
Used to record the fair value of works of art
FA_4.07.09.02 - Valuation: PPE Infrastructure
Used to record the fair value of infrastructure
FA_4.07.09.03 - Accumulated depreciation: PPE Infrastructure
Used to record the accumulated depreciation charge recognized for infrastructure
FA_4.08.01.01 - Cost: Patents, trademarks and other rights
Used to record the cost of patents, trademarks, and other rights
FA_4.08.01.02 - Accumulated amortisation and impairment: Patents,
Used to record the accumulated amortisation charge recognized for patents, trademarks, and other rights
FA_4.08.02.01 - Cost: Digital Library Collections
Used to record the cost of the digital library collection asset
FA_4.08.02.02 - Accumulated Amortisation-Digital Library
Used to record the accumulated amortisation charge recognized for the digital library collection asset
FA_4.08.03.01 - Cost: IT Software
Used to record the cost of computer software assets
FA_4.08.03.02 - Accumulated Amortisation -IT software
Used to record the accumulated amortisation charge recognized for computer software assets
FA_4.08.04.01.01 – Intangibles Construction in Progress
Used to record:
FA_4.09.01.01 - Right to Use Asset - Property
Used to record a right-of-use property asset where the University is lessee
FA_4.09.02.01 – Accumulated Depreciation - Right to use asset - Property
Used to record the accumulated depreciation charge recognized for a right-of-use property asset
FA_4.09.03.01 - Right to use asset - Equipment
Used to record right-of-use equipment asset where the University is lessee
FA_4.09.04.01 - Acc Depr Right to use asset – Equipment
Used to record the accumulated depreciation charge recognized for right-of-use equipment asset
FA_4.10.01.01 - Service Concession Asset: cost and depreciation
Used to record the current replacement cost of, and accumulated depreciation charge recognized for, a service concession asset
FA_5.04.04.01 - Current Lease incentive
Used to record current lease incentive liabilities where the University is lessor
FA_5.04.08.01.01 - Current Service Concession Liab
Used to record current service concession liabilities for service concession assets that are not existing assets of the University
FA_5.05.01.01 - Current Lease Liabilities
Used to record current lease liabilities where the University is lessee
FA_6.03.01.02 - Make good: Non-current provisions
Used to record non-current make good provisions to lessor property where the University is lessee
FA_6.04.02 - Non-current Lease incentive
Used to record non-current lease incentive liabilities where the University is lessor
FA_6.04.05.01 - Service Concession Liability
Used to record non-current service concession liabilities for service concession assets that are not existing assets of the University
FA_6.05.01.01 - Non-current lease liabilities
Used to record non-current lease liabilities where the University is lessee
FA_7.01.01.01.01 - PPE revaluation surplus
Used to record the accumulated revaluation surplus recognized for revalued assets
Project Type code
3NN
4NN
Capital Management Plan (CMP) code for IT capital works project
Capital Management Plan (CMP) code for Property capital works project
Project Type codes are used to identify capital works projects for purposes of the Capital Management Plan budget and reporting.
Project Group code
Project Group code for Property CMP projects
The Project Group codes are used to group Property capital works projects for purposes of the Capital Management Plan budget and reporting.
Funding Scheme code
80001 MQ Prop Capex
81001 MQ IT Capex
Property capital works project
IT capital works project
The Funding Scheme codes are used to identify capital works projects for the Capex Project Report.
Building code
Building for Property capital works
The Building codes are used to connect Property capital works projects to buildings, and Asset Register records.
16998/30
Used to record the credit entry for Property capital works expenditure transferred to the CIP account
18088/30
Used to record the credit entry for IT capital works expenditure transferred to the CIP account
no capitalization of operating costs;
Property, Plant & Equipment;
Service concession Assets
$10m
Intangible Assets;
Right of Use Assets.
$2.5m
≤ $10m
Director, Financial Operations, Tax and Treasury
≤ $50m
Deputy Group Chief Financial Officer
> $50m
Vice-President, Finance and Resources
Property, Plant & Equipment
$2m
Intangible Assets
$2m
< $500k
Director Financial Operations
< $2m
Deputy Group Chief Financial Officer
> $2m
Vice-President Finance & Resources
Less than $250k
Quarterly (months 4,7,10,12)
More than $250k
Monthly
If capitalizable
5012 - Library Collection CAPEX, part of MR_7.01.01.01 - Capital Equipment
If not capitalizable
5026 - Library Collection OPEX, part of MR_4.04.01.22 - Library Collections
Physical books
PPE: Library General
Digital subscriptions with access rights in-perpetuity
Intangible Asset: Digital Library Collections
One
Asset classes and sub-classes
Two
Revaluation requirements for Land, Buildings and Infrastructure
Three
Natural Accounts used within the scope of this Procedure
This Appendix provides general guidance on non-current asset expenditure should be grouped by asset sub-class in preparation for capitalisation to the Asset Register. Examples of expenditure are not exhaustive.
PPE NOTE
Land
LAND
Land
LAND
Land over which the University has legal title
Buildings
BUILDING
Buildings
BUILDING
A building includes all internal and external structural works and typically includes:
preliminaries, scaffolding demolition, excavation and professional fees associated with surveying,
project management and architecture
Authorities/permits utilities/demolition
Consultants fees including legal & security
Structural works
Tunnels/excavation
Slab/pilings/footings frame roof/ceilings/floors/walls
Windows
Exterior fabric
Elevators
Fire services
Plant & Equipment
P&E
Agricultural assets
PE_AGRI
Historical code with nominal remaining NBV - do not use going forward
Fixture and Fittings
PE_F&F
Fixtures and fittings from interior fit outs, including:
False ceilings
Screens and partitioning
Doors and door hardware
Signage and banners
Refrigeration and Air Conditioning
PE_AIR
Refrigeration and Air Conditioning equipment.
Audio Visual (AV)
PE_AV
Audio Visual equipment
Communications
PE_COMM
Communications equipment
Electrical equipment
PE_ELEC
Electrical equipment including fire and lighting
Co-Generation Plant
Furniture
PE_FURN
Office and lab space furniture that meets the collective spend threshold limits defined in the Accounting Policy Register, including:
Chairs and desks
Meetings tables
Bookcases/filing systems/drawers
Whiteboards
Physical IT equipment
PE_IT
Physical IT equipment including servers, switches etc.
PE_ITPRJ
Historical code with nominal remaining NBV - do not use going forward
PE_LAB
Laboratory Equipment
PE_MED
Medical Equipment
PE_MISC
Miscellaneous Equipment – only use this code if not other code is appropriate
PE_OFF
Historical code with nominal remaining NBV - do not use going forward
PE_PHOTO
Historical code with nominal remaining NBV - do not use going forward
PE_REFUB
Historical code with nominal remaining NBV - do not use going forward
PE_WSHOP
Historical code with nominal remaining NBV - do not use going forward
Motor Vehicles
MV
Motor Vehicles
MV
Motor Vehicles registered to a University entity.
Note: this asset class is included within Plant & Equipment in the financial statements
Leasehold Improvement Asset
LHI
Leasehold Improvement Asset
LHI
Capitalizable Fit Out and other improvement costs incurred to ready a leased site for use.
Make Good Assets covering the expected costs of returning the lease property to its original condition at the end of the asset
Library General
LIBGEN
Library General
LIBGEN
Physical books and journals and other physical library learning content owned by the University
Library Special
LIBSPEC
Library Special
LIBSPEC
Physical specific library collection, including rare books, rare maps
Works of Art
WOA
Museum Collection
ART_MC
Specific Museum Collections including: the Museum of Ancient Culture; Numismatic Collection and the Macquarie Chair
Works of Art
ART_WOA
Works of Art (including paintings and sculptures) either purchased or gifted under the Cultural Gifts Program
Infrastructure
INFRA
Infrastructure
INFRA
Physical structures and facilities, typically fixed in nature (e.g. buildings, roads, power supplies) required for the operation of the University. Examples include:
Intangibles:
INTANGIB
Patents
PATENTS
Issued patents
IT software
ITSOFTWA
Capitalizable software costs, including eligible cloud computing services expenditure – refer to Accounting Policies Register for guidance
Digital library collection
DIGITLIB
Digital Library assets where the licence to the asset provides access to the information in perpetuity
Right of Use Asset
RUA
Right of Use Asset: Property
RUA_PROP
Right of Use Asset over property leased to an entity in the University Group
Right of Use Asset: IT Assets
RUA_ITEQ
Right of Use Asset over physical IT assets leased to an entity in the University Group (not cloud computing – refer ITSOFTWA above)
Service Concession Asset
SCA
Service Concession Asset: Building
SCA_BLDG
Service Concession Asset over assets leased to a third party in the University Group (lessor).
Service Concession Asset: Land
SCA_LAND
Service Concession Asset: Infrastructure
SCA_INFR
These asset classes are formally revaluations annually by external expert valuers, on a rotational triennial pattern of physical and desktop techniques, as detailed below.
Formal and desktop revaluation typical activities and outputs are summarised below:
Year 1
Formal revaluation
Year 2
Desktop valuation performed by external valuer
Year 3
Desktop valuation performed by external valuer
On campus inspection of subject assets
P
O
All
Titles searches including all leases and other encumbrances on assets with summary of impact on valuations
P
O
Land within Campus boundaries
Review of tenancy schedules for tenanted properties
P
P
Tenanted Buildings and land
Review of available market evidence to reassess the market approach and the income approach of subject assets including the provision of the supporting documentation and schedules for each asset.
P
P
Tenanted Buildings and land
Review of available market evidence to reassess the land value apportionment of subject assets
P
P
Tenanted Buildings and land
Review of published cost information (i.e. Rawlinson Construction Handbook) or other indices appropriate to the asset category
P
P
Non-tenanted buildings
Infrastructure
Validate key assumptions with management (Property and Finance) on each asset category
P
P
All
Assess actual costs for recent construction projects on comparable assets
P
P
Non-tenanted buildings
Infrastructure
Validate with management on key assumptions impacting land valuation specifically Campus Plan (for changes in Gross Floor Area limits and allowable development on each Precinct) and market evidence of rates per Gross Floor Area/other metrics for each Precinct
P
P
Land within Campus boundaries
Engagement with external auditors on queries and the provision of supporting documents as requested by auditors.
P
P
All
MR_7.01.01.01 - Capital Equipment
4144 I/Coy - FA Purchase MQH
4607 Sculpture and Artworks - Capital
4719 Patent Expenses
5005 Equipment - Capital
5012 Library Collection CAPEX
5014 Artefacts - Capital
5016 IT Capital Projects
MR_4.04.02.01 - CMP - WIP - Design phase
MR_4.04.02.01 - CMP - WIP - Design phase (continued)
5201 WIP CMP - Council/Department of Planning
5202 WIP CMP - Community Liaison Groups
5203 WIP CMP - Environmental Protection
5205 WIP CMP - Electrical Supply
5206 WIP CMP - Gas Supply
5208 WIP CMP - Health
5210 WIP CMP - Roads and Maritime Services
5211 WIP CMP - State Rail
5216 WIP CMP - Consultant Project Manager
5217 WIP CMP - Architect
5218 WIP CMP - Interior Design
5219 WIP CMP - Quantity Surveyor
5220 WIP CMP - Structural Engineer
5221 WIP CMP - Facade Engineer
5222 WIP CMP - Electrical Services Design
5223 WIP CMP - Mechanical Services Design
5224 WIP CMP - Lift Services Design
5225 WIP CMP - Hydraulic Services Design
5226 WIP CMP - Fire Services Design
5227 WIP CMP - Kitchen Design
5228 WIP CMP - Enviro Sustainable Design
5229 WIP CMP - Geotechnical Consultant
5230 WIP CMP - Landscape Design
5231 WIP CMP - Traffic Consultant
5232 WIP CMP - Acoustic Consultant
5233 WIP CMP - Signage, Graphics Design
5234 WIP CMP - Planning
5235 WIP CMP - Land Surveyor
5236 WIP CMP - BCA Consultant
5237 WIP CMP - Fire Engineer
5238 WIP CMP - Disabled Access Consultant
5239 WIP CMP - Private Certifying Authority
5240 WIP CMP - Heritage, Archaeological
5241 WIP CMP - Dilapidation Surveyor
5242 WIP CMP - Tenants
5243 WIP CMP - Hazmat Consultant
5244 WIP CMP - Audio Visual Design
5245 WIP CMP - IT & Comms Design
5247 WIP CMP - Property Marketing
5248 WIP CMP - Feasibility
5249 WIP CMP - Taxes
5250 WIP CMP - Legal Costs
5251 WIP CMP - Land/Building Costs
5252 WIP CMP - Capitalised Financial Costs
5254 WIP CMP - Contingency
MR_4.04.02.02 - CMP - WIP - Construction phase
5212 WIP CMP - Long Service Levy
5255 WIP CMP - Main Contractor
5256 WIP CMP - Temporary Buildings
5257 WIP CMP - Plant Hire and Purchase
5258 WIP CMP - General Office Consumables
5259 WIP CMP - Demolisher
5260 WIP CMP - Excavation, Shoring, Piling
5261 WIP CMP - Landscaping
5262 WIP CMP - Concrete Structure Works
5263 WIP CMP - Masonry
5264 WIP CMP - Waterproof Membranes
5265 WIP CMP - Steel Structure
5266 WIP CMP - Metalwork
5267 WIP CMP - Louvres, Grilles, Shutters
5268 WIP CMP - Balustrade, Handrail, Fencing
5269 WIP CMP - Carpenter
5270 WIP CMP - Doors, Frames and Hardware
5271 WIP CMP - Joinery, Toilet Partition
5272 WIP CMP - Roofing, Wall Cladding
5273 WIP CMP - Sanitary Plumbing, PC Items
5274 WIP CMP - IT & Communications
5275 WIP CMP - Fire Protection Services
5276 WIP CMP - Air Conditioning & Ventilation
5277 WIP CMP - Lift & Escalator Services
5278 WIP CMP - Electrical Services
5279 WIP CMP - Audio Visual
5280 WIP CMP - Partitions and Ceilings
5281 WIP CMP - Insulation
5282 WIP CMP - Floor Finishes
5283 WIP CMP - Shopfronts, Windows, Mirrors
5284 WIP CMP - Blinds, Window Furnishings
5285 WIP CMP - Painting
5287 WIP CMP - Final Clean
5288 WIP CMP - Kitchen Equipment
5289 WIP CMP - Furniture, Fixture & Equipment
5290 WIP CMP - Removalists
5291 WIP CMP - Concrete Cutting, Coring
5293 WIP CMP - Defects Liability Period
MR_4.05.01.01 – Depreciation
4047 Amortization Equipment
4049 Lease Amortisation
4711 Depreciation
4730 Leasehold Imp Depreciation Expense
4734 Infrastructure Depreciation Expense
4735 Buildings Depreciation Expense
4736 Plant and Equipment Depreciation Expense
4737 Library Collection Depreciation Expense
4738 Motor Vehicle Depreciation Expense
4739 IT Capital Resources Depreciation Expense
4741 Service Concession Asset Depreciation expense Bldg
4742 Service Concession Asset Depreciation expense Infrastructure
4743 Service Concession Asset Dep Expense and SC Dep F&F
MR_4.05.01.02 - Amortisation
4731 Amortisation digital Library collections
4732 Amortisation IT Software
4733 Patents Amortisation Expense
MR_4.01.02.02.01 - Professional Salaries
2116 Professional Internal Salary Recharges
MR_4.04.01.07-Non-capitalised equipment
4120 I/Coy - Equipment Non Capital MUH
4121 I/Coy - Equipment R&M MUH
4206 Furniture
4718 Minor Equipment Purchases PVT
5006 Equipment - Non Capital
5007 Equipment - maintenance and repairs
5009 Finishing
5017 IT Equip below $5000
5018 Office Equipment & Appliances below $5,000
5019 Lab Equipment below $5000
5037 IT Project Non-Capital Expenses
MR_4.04.01.13 – Subscriptions
4400 Library materials
4402 University Subscription
MR_4.04.01.22 - Library Collections
5026 Library Collection OPEX
MR_4.04.01.23 - Computing, IT and Software
4001 Telephones/ Fax/ Telex TEST
4126 I/Coy - Telephone/Internet MUH
4803 ITS -Telephone/ Fax Call Charges
5001 Computer software and licenses
5004 Computing services
5028 IT Hardware Maintenance
5029 IT Software Maintenance
5030 IT Systems Support
5031 IT Hosting (non-cloud) Services
5032 IT Cloud Services
5033 Cyber Security
5034 Delivery as a Service
5035 Infrastructure as a Service
5036 Software as a Service
MR_4.04.02.03 – Facilities
MR_4.04.02.03 – Facilities
(continued)
4119 I/Coy - Repairs & Maintenance MUH
4133 I/Coy - Repairs & Maintenance MUCA
4205 Maintenance contracts
4207 Building Consultants Fees
4208 Student Housing
4209 Removal charge
4211 Minor construction, less than $5000
5002 Roadworks
5003 Floor Coverings
5008 Landscaping
5010 New Building Works - Contract
5011 Maintenance & Repairs existing Services & Bldgs
5013 Upgrade/ Improvements Existing Bldgs
5309 Air Con/Refrigeration - Contract
5310 Air Con/Water Treatment-Contract
5311 Air Con/Refrigeration - Indoor Air Quality/Filters
5312 Air Con/Refrigeration - HVAC Repairs
5313 Air Con/Refrigeration - Other Repairs
5320 Bldg Sup - Building Contract
5323 Bldg Sup - Other,Casual Wages
5324 Bldg Sup - Uniforms
5325 Bldg Sup - Telephones
5326 Roads, Paths & Carpark - R&M
5327 Car Parking - Other
5331 Fire - False Alarms & Processing Fees
5332 Fire - Contract
5333 Fire - R&M-Lighting
5334 Fire - Evac Equip & Training, EWIS
5336 Fire - Telephone / Fire Line/Monitoring
5337 Fire - Other
5338 Lifts & Esc - Contract
5339 Lifts & Esc - R&M
5340 Lifts - Preventative
5341 Pest Control - Contract
5343 General Maintenance Contract
5344 R&M - Electrical
5345 R&M - Lamps, Tubes, Globes
5346 R&M - Locks, Keys, Cards
5347 R&M - Painting
5348 R&M - Plumbing, Drainage Systems
5349 R&M - Auto Doors, Roller Shutters
5350 R&M - Other
5351 Plumbing - Contract
5352 Plumbing - Statutory
5353 Electrical - Contract
5354 BAS, BMS & Controls - Contract
5355 BAS, BMS & Controls - Other
5359 Security-R&M, Access Keys
5361 Gardening - Common Areas Internal
5362 Gardening - Common Areas External
5384 NR – Preventative Repairs and Maintenance
5385 RE - Airconditioning Recharge
5386 NR - Corrective R&M
5395 RE - Locksmith/Other Recharge
5397 Lifts - Corrective
5398 Electrical - Statutory
MR_4.04.01.26 - Gain or loss on disposal of Assets
1707 Profit/Loss on Investment disposal
1909 Disposal Clearing Account
1910 Cash from Disposal of Assets
1914 Cash from disposal of asset
1915 NBV of asset - gain on disposal
4136 I/Coy- FA Purchase AMQ
4143 I/Coy - Equipment Non Capital AMQ
4705 NBV of All Assets Written-Off
4706 Loss on Disposal of Assets - PPE
4707 NBV of All Assets Disposed
4722 NBV of asset - gain on disposal
FA_4.02.01 - Non-current Finance lease receivables
8240 Finance Lease MURP Non-Current
FA_4.05.01.01.01 - Non-current Lease asset
8144 Lease Asset - Cochlear - Non Current
8244 Lease Asset - Hearing Hub - Cochlear - Non Current
8245 Lease Asset - Hearing Hub - AHS - Non Current
FA_4.07.01.01 - Cost: PPE Construction in progress
8205 Buildings in Progress
8225 Work In Progress - Other
8227 Cap interest & transa cost on borrowing
FA_4.07.02.02 - Valuation: PPE Land
8207 Land
FA_4.07.03.02 - Valuation: PPE Buildings
8208 Buildings
FA_4.07.03.03 - Accumulated depreciation: PPE Buildings
8215 Accumulated Depreciation - Buildings
FA_4.07.04.02 - Valuation: PPE Plant and equipment
8209 Plant & Equipment
8211 Motor Vehicles
FA_4.07.04.03 - Accumulated depreciation: PPE Plant and equipment
8213 Acc Dep Land, Art, Library Special
8216 Accumulated Depreciation - Plant & Equip
8218 Accumulated Depreciation - Motor Vehicle
8220 Accumulated Impairment Loss
8307 Accrued Accumulated Depreciation - Central Finance
FA_4.07.05.01 - Cost: PPE Leasehold improvements
8229 Leasehold Improvements
FA_4.07.05.03 - Accumulated depreciation: PPE Leasehold improvement
8230 Accumulated Depreciation - Lease Hold Improvement
FA_4.07.06.01 - Cost: PPE Library General
8212 Library Collection - General
FA_4.07.06.03 - Accumulated depreciation: PPE Library General
8217 Accumulated Deprec - Library Collections
FA_4.07.07.02 - Valuation: PPE Library Special
8222 Library Collection - Special
FA_4.07.08.02 - Valuation: PPE Works of Art
8210 Works of Art
FA_4.07.09.02 - Valuation: PPE Infrastructure
8221 Infrastructure
FA_4.07.09.03 - Accumulated depreciation: PPE Infrastructure
8214 Accumulated Depreciation - Infrastructure
FA_4.08.01.01 - Cost: Patents, trademarks and other rights
8200 Patent Portfolio
8292 Work in Progress Patents
FA_4.08.01.02 - Accumulated amortisation and impairment: Patents,
8223 Accumulated Depreciation - Patents
FA_4.08.02.01 - Cost: Digital Library Collections
8248 Digital Library collections
FA_4.08.02.02 - Accumulated Amortisation-Digital Library
8300 Accumulated Amortisation-Digital Library
FA_4.08.03.01 - Cost: IT Software
8249 IT Software
FA_4.08.03.02 - Accumulated Amortisation -IT software
8301 Accumulated Amortisation -IT software
8308 Accrued Accumulated Amortisation- Central Finance
FA_4.08.04.01.01 – Library Collection Construction in Progress
8142 Library Collection prepayments - Capex
8224 Work In Progress - IT
FA_4.09.01.01 - Right to Use Asset - Property
8323 Lease Right of Use Asset
FA_4.09.02.01 – Accumulated Depreciation - Right to use asset - Property
8302 Accumulated Depreciation for ROU Asset
FA_4.09.03.01 - Right to use asset - Equipment
8326 Lease Right of Use Asset Equipment
FA_4.09.04.01 - Acc Depr Right to use asset – Equipment
8303 Accumulated Depreciation Leases Equipment
FA_4.10.01.01 - Service Concession Asset: cost and depreciation
8350 Service Concession Asset – Land
8351 Service Concession Asset – Bldg
8352 Accumulated Depreciation – Service Concession Asset Bldg
8353 Service Concession Asset – Infrastructure
8354 Accumulated Dep – Service Concession Asset – Infrastructure
8355 Service Concession Asset – Furnitures & Fixtures
8356 Accumulated Dep – Service Concession Asset – F&F
FA_5.04.04.01 - Current Lease incentive
Nil active
FA_5.04.08.01.01 - Current Service Concession Liab
9561 Service Concession Liability -CURRENT
FA_5.05.01.01 - Current Lease Liabilities
9536 Lease liability equipment FSE - current
9542 Lease Liability - Current
9550 Lease Liability Equipment - Current
FA_6.03.01.02 - Make good: Non-current provisions
9034 Make Good Provision
FA_6.04.02 - Non-current Lease incentive
Nil active
FA_6.04.05.01 - Service Concession Liability
9560 Service Concession Liability
FA_6.05.01.01 - Non-current lease liabilities
9537 Lease liability equipment FSE - non-current
9543 Lease Liability - Non Current
9551 Lease Liability Equipment- Non Current
FA_7.01.01.01.01 - PPE revaluation surplus
FA_7.01.01.01.01 - PPE revaluation surplus
(continued)
9400 Asset Revaluation Reserve
9402 Realized Revaluation Reserve
9403 Revaluation Reserve Land Capital Assets
9404 Revaluation Reserve Bldg Capital Assets
9405 Revaluation Reserve Infrastructure Capital Assets
9406 Revaluation Reserve WOA Capital Assets
9407 Revaluation Reserve Library Capital Assets
9408 Revaluation Reserve Plant and Equipment